
|

|
Capital Development
Since its foundation in 1930, Sacred Heart Grammar School has aimed to provide a broadly based education for its students, which equips
them with the qualities, the knowledge and the skills to play a full part in their professional and public life, whatever their chosen
paths.
|
While the School has gone from strength to strength in its achievements and is now established as a nationally renowned centre of
excellence, the Staff, Board of Governors and Parents have been aware that these achievements have, without doubt, been aided by
the facilities available to the students and staff. Since the opening of the new school in 1985, significant capital investment has
been carried out and this has been summarised below :
|
- A new technology block has been built
- The library, staff-room and reprographics room have been refurbished
- New storerooms have been created
- A lift has been installed
- New computer suites have been created for staff and pupils
- The foyer has been upgraded
- The car park has been extended to the back of the school
- The drama room, careers room and offices, and bursar’s office have all been refurbished
- A counselling room, medical room and fitness suite have been created
- CCTV has been installed
- 4 mobile classrooms have been added and 3 interview rooms have been created
- St.Francis Hall has been extended to create a lunch/dinner/study hall
- There have been improved facilities for teacher preparation and marking
- The existing language laboratory has been refurbished and a new laboratory has also been created
- A new Vice-Principal’s office has been created
- The Canteen has been upgraded to a Cash-Free Cafeteria System
- Solid fencing has been installed around the school perimeter
- A hockey pitch has been created
- A driving range has been created for golf lessons
- New trees, plants and shrubbery have been continually added
|
Top of Page
|
|





NMALC
Information Video
School
Inspection Report
SHS
Annual Report
|